Contractors trust us to solve the AV problems others can’t.

Metcon, the contractor for a San Jose high-end business center, came to a portion of their project that hadn’t been well coordinated with the architect. The space at this point was already finished and built out. However the original location designated for a state-of-the-art projector no longer worked. To complete the initial drawings would require Metcon to tear down and reconstruct a good portion of the room. Other proposed solutions hinged on a redesign. Both options added additional costs in time and money, neither of which were available.

Having partnered with us before, Metcon presented the problem to us and gave us latitude to solve the problem within the time and scope of the project. Past experience helped Metcon see us as a trusted resource equipped with the experience necessary to quickly solve such problems.

As requested without pushing deadlines or raising costs, we developed a solution that fit seamlessly into the area available by dropping the projector and screen from the ceiling when needed. Utilizing the limited ceiling space, we built a lift that lowered the projector when in use. The sophisticated design and installation matched the high-end feel of the space. The solution left both Metcon and their client more satisfied than they had been with the initial plan.

Projects: 100+

Project size: 3,000-110,000 sq ft

Services: Tenant Improvement